Gujranwala, one of Punjab's most important industrial cities and Pakistan's fourth-largest city, is expanding its EV charging presence along the GT Road and motorway service areas. Known for its steel, ceramics, and food industries, Gujranwala's corporate sector is beginning to electrify commercial fleets, driving demand for reliable urban charging infrastructure.
Gujranwala has PSO-operated DC fast charging along the GT Road corridor, Pakistan's oldest and most-travelled intercity road. The CCS2 DC chargers are compatible with BYD Atto 3, MG ZS EV, and Changan Uni-V. For drivers on the Lahore–Sialkot route (75km GT Road/M-11 section), Gujranwala offers a convenient mid-point charge that eliminates range anxiety on the corridor. DC charging from 20% to 80% takes approximately 25–35 minutes.
Type 2 AC charging is available at multiple PSO stations along the Gujranwala GT Road bypass and Ring Road. The industrial character of the city means many private operators and corporate fleet operators have installed AC charging in industrial estates including Gujranwala Industrial Estate and GIGA (Gujranwala Industrial and General Authority) zones. Overnight AC charging (7kW over 6–8 hours) is the preferred strategy for Gujranwala-based EV fleet operators.
PSO leads EV charging infrastructure in Gujranwala, with multiple charging points along the GT Road corridor. The city's industrial base — Pakistan's largest steel, ceramics, and fan manufacturing cluster — is driving commercial EV fleet adoption, which in turn is attracting private operator investment. Go Green Network is expected to expand into Gujranwala's commercial zones as the GT Road corridor becomes a more defined EV route between Lahore and Sialkot.
The Grand Trunk Road through Gujranwala has PSO service stations with EV charging. Useful if traveling between Lahore and Sialkot or continuing to Gujrat.
Several large industrial firms in Gujranwala have installed private AC chargers for company EVs. If traveling for business, inquire with your host company about access.
Public charging infrastructure in Gujranwala is still developing. Charge fully in Lahore (30 min via M-2/GT Road) before visiting to avoid relying solely on local chargers.
Every verified station — area, speed, connector, price, and operating hours. Real data from Charging Station Radar's verified operator database.
| Station | Area | Speed | Connector | Price | Hours |
|---|---|---|---|---|---|
| EV Charging — Jinnah Rd | Jinnah Rd | Type 2 | — | Open 24 hours | |
| Gujranwala Charging Station 03008511823 | Gujranwala | AC 22kW (Fast) | Type 2 | — | — |
| Gujranwala DC Charging Station 03086462190, 03456531144 | Gujranwala | DC 80kW | CCS2, GB/T | Rs 110/kWh | — |
| BMW Destination — Main Grand Trunk Rd +92 321 2556100 | Main Grand Trunk Rd | AC 22kW (Fast) | Type 2 | — | Open 24 hours · +92 321 2556100 |
| BMW Destination — Sialkot, Gujranwala Rd +92 321 2556100 | Sialkot, Gujranwala Rd | AC 22kW (Fast) | Type 2 | — | Open 24 hours · +92 321 2556100 |
| Gujranwala 80kW EV Station +92 308 6462190 / +92 345 6531144 | Gujranwala | DC 80kW (Fast) | CCS2, GB/T | Rs 110/kWh | 24 hours |
* Prices verified May 2026. Confirm current rates at the station before charging.
Real-world cost for a 20–80% charge (30.2kWh) on a MG ZS EV at Gujranwala's average public rate of Rs 115/kWh.
PSO standard rate. Gujranwala to Lahore (75km) typically requires only a partial top-up at either end.
30.2kWh × Rs 115/kWh — Gujranwala avg public rate
Same 30.2kWh at WAPDA domestic Rs 50/kWh — 55% cheaper than petrol
Primary DC fast charge connector at PSO stations. Compatible with BYD Atto 3, MG ZS EV, and Changan Uni-V.
BYD Atto 3, MG ZS EV, Changan Uni-V
Standard AC connector at PSO and corporate charging points in industrial estates. 7kW charging standard.
All EVs sold in Pakistan — universal AC compatibility
Limited availability in Gujranwala. Primarily at newer PSO installations — confirm availability before visiting.
BYD Atto 3, Changan Oshan X7, HAVAL Jolion EV
GT Road charging stations in Gujranwala are busiest during the 8–10 AM and 5–8 PM commuter windows as drivers transit between Lahore and Sialkot. Mid-day (11 AM–3 PM) and late evening are reliably less busy. Industrial fleet operators tend to charge overnight, so commercial charging points may be in use during business hours.
Gujranwala's industrial economy positions it as one of Pakistan's fastest-growing EV fleet cities. Industrial operators are the primary early adopters — Gujranwala Steel Mills and ceramics manufacturers are electrifying delivery and logistics vehicles. As commercial fleet EV penetration grows, public fast charging infrastructure along GT Road is expected to expand significantly in 2026–2027. The M-11 motorway (Lahore–Sialkot) has designated charging areas that are in planning stages, which will relieve GT Road congestion for EV charging.
Submit a charging station in 60 seconds. Verified in 48 hours · always free.