Karachi leads Pakistan in high-speed DC fast charging infrastructure. Shell Recharge in DHA Phase 5 operates one of the country's fastest public chargers at 180kW.
Karachi holds the distinction of hosting Pakistan's fastest public charger: Shell Recharge DHA Phase 5 operates at 180kW DC — capable of adding 100km of range in under 10 minutes for a compatible EV. ABB's station on the M-9 motorway corridor offers 60kW DC for inter-city travellers heading to Hyderabad, and PSO service stations along M-9 complete the DC fast charging backbone for Karachi's coastal motorway corridor.
AC destination charging in Karachi clusters around the DHA and Clifton belts, where Ocean Mall and Dolmen Mall Clifton offer 22kW AC chargers integrated into mall parking. The Askari IV complex and Clifton Block commercial areas add further AC capacity for Karachi's densest EV ownership zones. Type 2 is the universal connector at every public AC charger in Karachi.
Shell Recharge leads Karachi's premium charging segment, with the DHA Phase 5 flagship being the highest-power public station in Pakistan. ABB and PSO provide motorway-corridor coverage on the M-9 route, forming the city's inter-city charging backbone. Private operators and dealership-linked chargers — primarily in DHA — are expanding rapidly to serve Karachi's fast-growing EV fleet.
Shell Recharge DHA Phase 5 offers 180kW DC charging — add 100km of range in under 10 minutes. Ideal for quick top-ups between meetings in DHA.
Ocean Mall Clifton, Dolmen Mall Clifton, and Askari IV cover Karachi's upscale coastal belt with AC chargers in mall parking — perfect for 60–90 minute destination charges.
ABB and PSO stations on M-9 support the Karachi–Hyderabad route with 60kW+ DC chargers. Charge fully in DHA before joining the motorway for the most comfortable run.
Every verified station — area, speed, connector, price, and operating hours. Real data from Charging Station Radar's verified operator database.
| Station | Area | Speed | Connector | Price | Hours |
|---|---|---|---|---|---|
| EV Charging — Main Rd +92 347 1212774 | Main Rd | DC 150+kW (Ultra Fast) | Type 2 | — | Closed · Opens 1 PM Fri · +92 347 1212774 |
| Z-Volta Charging Station PECHS 03104446529 | 36-F, Block-6 Block 6 P.E.C.H.S., Karachi | AC 7kW (Slow) | Type 2 | — | 24 Hours |
| ZVolta Charging Station IBA Karachi 03104446529 | IBA KArachi, Karachi University | AC 7kW (Slow) | CCS2 | — | 24 Hours |
| Metro Safari Park BYD Charging Station +92 111 111 BYD (293) | Near Safari Park Karachi | DC 30kW | CCS2, Type 2 | — | 24 Hours |
| Shell Recharge Charging Station +92 301 5061829 | 39 Khayaban-e-Bahria | DC 50-180kW | CCS2 | Rs 105/kWh | Temporarily closed · +92 301 5061829 |
| ABB Charging Station N/A | Karachi - Hyderabad Motorway, M-9 Gadap Town,Karachi | DC 50kW | CCS2, Type 2, CHAdeMO | Rs 109/kWh | 24 Hours |
| ZVolta Charging Station N/A | Block 6 PECHS | AC 7kW (Slow) | CCS2 | — | 24 Hours |
| BYD Charging Station Ocean Tower Karachi +92 111 111 BYD (293) | Block 9 Ocean Tower | DC 30kW | CCS2 | — | 12:00 PM - 10:00 PM |
| BMW Destination — 4 Club Rd +92 333 2391199 | 4 Club Rd | AC 22kW (Fast) | Type 2 | — | Open 24 hours · +92 333 2391199 |
| BMW Destination — 112 Shahra-e-Faisal +92 321 2556100 | 112 Shahra-e-Faisal | AC 22kW (Fast) | Type 2 | — | Open 24 hours · +92 321 2556100 |
| BMW Destination - Karachi +92 21 34323693 | PECHS, Karachi | AC 22kW (Fast) | Type 2 | — | Open · Closes 6 PM · +92 21 34323693 |
| BMW Destination — 3-A Food St Rd +92 21 35205244 | 3-A Food St Rd | AC 22kW (Fast) | Type 2 | — | Open 24 hours · +92 21 35205244 |
| ZVolta Charging Station +92 310 4446529 | Maintenance Department power house solar Parking, IBA university | Varies by partner site | Type 2 | — | Open · Closes 9 PM · +92 310 4446529 |
| Z-Volta Charging Station +92 310 4446529 | 36-F | Varies by partner site | Type 2 | — | Open 24 hours · +92 310 4446529 |
| EV Charging — Plot No. 164, Main National Highway, near Abbot laboratory +92 311 1438111 | Plot No. 164, Main National Highway, near Abbot laboratory | AC 22kW (Fast) | Type 2 | — | Open · Closes 5:30 AM Tue · +92 311 1438111 |
| ZVolta Charging Station | Block 6 PECHS Shahr e faisal 6 | Varies by partner site | Type 2 | — | — |
| BMW Destination — Karachi - Hyderabad Motorway +92 321 2556100 | Karachi - Hyderabad Motorway | AC 22kW (Fast) | Type 2 | — | Open 24 hours · +92 321 2556100 |
| Inverex Charging Station +92 303 3878638 | Plot No. 14, Main Shahra-e-Faisal | DC 60kW | CCS2 | Rs 115/kWh | Open · Closes 7 PM · +92 303 3878638 |
| Electric Vehicle Charging Station Amroha Socety 03471212774 | Main Rd, Sadaat E Amroha Society Gulzar E Hijri Scheme 33, Karachi, | DC 50kW | CCS2, Type 2, CHAdeMO | Rs 90/kWh | Varies |
| Inverex Charging Station Shahrah - E - Faisal 03033878638 | Main Shahra-e-Faisal, Karachi Administration Employees Housing Society Bangalore Town, Karachi | DC 60kW | CCS2, Type 2, CHAdeMO | Rs 115/kWh | 24 Hours |
| BYD Charging Station in Karachi (NLC Karachi) +92 111 111 BYD (293) | NLC Location Karachi | DC 60kW | CCS2 | — | 24 Hours |
| BYD Metropole Hotel Charging Station Karachi +92 111 111 BYD (293) | Metropole Hotel, Club Road | DC 60kW | CCS2, Type 2 | — | 24 Hours |
| ABB Charging Station | Karachi - Hyderabad Motorway | DC 50kW (Fast) | CHAdeMO | — | Open 24 hours |
| KIA Electric Vehicle Charging Station 03111438111 | Plot No. 164, Main National Highway, near Abbot laboratory, Allana Goth Quaidabad, Karachi | DC 50kW | CHAdeMO, Type 2 | Rs 110/kWh | 24 Hours |
| BYD Q Star PSO EV Charging Station Karachi +92 111 111 BYD (293) | Karachi Cantt | DC 60kW | CCS2, Type 2 | — | 24 Hours |
| Giga Mall (DHA Entrance) +92 311 4339489 (Saqib) / +92 314 1985076 (Ahmed) | DHA entrance side, Giga Mall | DC 60-120kW (Fast/Ultra Fast) | CCS2 | Rs 110/kWh | 24 hours |
| North Karachi Industrial 240kW EV Station +92 312 6067480 / +92 303 2231032 / +92 335 3344926 | Sector 12-D Plot No. 11, North Karachi Industrial Area | DC 240kW (Ultra Fast) | CCS2 | — | 24 hours |
| North Nazimabad EV Station (KDA Apartment) +92 312 6067480 / +92 303 2231032 / +92 335 3344926 | Block-A, KDA Apartment, Shop 34, St-08, North Nazimabad | DC 120kW (Ultra Fast) | CCS2 | — | 24 hours |
| The Ocean Mall (Karachi) | Ocean Mall, Basement Parking | DC 30kW (Fast) | CCS2 | — | Mall hours |
| Shell Recharge — Askari IV, Gulistan-e-Johar | Rashid Minhas Rd, next to McDonald's, Askari IV | DC 50kW (Fast) | CCS2 | Rs 105/kWh | Open 24 hours |
| GO Petroleum - Libra Autos | Civil Lines | DC 160kW (Ultra Fast) | CCS2 | — | Open 24 hours |
* Prices verified May 2026. Confirm current rates at the station before charging.
Real-world cost for a 20–80% charge (36.3kWh) on a BYD Atto 3 at Karachi's average public rate of Rs 112/kWh.
Honda City 14km/L at Rs 260/L for equivalent 218km
36.3kWh × Rs 112/kWh — Karachi avg public rate
Same 36.3kWh at WAPDA domestic Rs 50/kWh — 55% cheaper than petrol
Combined Charging System — the DC fast charging standard for European and Korean EVs. Used at Shell Recharge DHA Phase 5 and most private fast chargers in Karachi.
MG ZS EV, MG4, Peugeot e-208, BYD Atto 3 (also has GB/T)
Chinese DC fast charging standard. Required for Chinese-brand EVs at compatible stations. ABB on M-9 supports GB/T alongside CCS2.
BYD Atto 3, BYD Seal, HAVAL Jolion EV, Changan Oshan X7
The universal AC charging connector used at every public AC charger in Karachi — malls, petrol stations, and commercial parking.
All EVs sold in Pakistan — universal compatibility
The best places to spend your charging time — coffee, food, shopping, and prayer. Real picks from Karachi's top charging locations.
Pakistan's fastest public charger at 180kW DC means you spend less time waiting and more time doing. Shell DHA Phase 5 is surrounded by DHA's dining and grocery strip — a quick coffee run or grocery errand fits perfectly in the 15 minutes it takes to add 100km of range.
Ocean Mall Clifton's AC 22kW charger sits in the basement parking near the Clifton seafront. The mall has a full food court, retail floors, and easy beach access for a 10-minute walk-break. One of Karachi's most pleasant charge stops.
The Clifton belt has multiple AC chargers near Dolmen and the surrounding commercial strip. Pakistan's most premium retail experience pairs naturally with a 60-minute charge session — Dolmen's food floor and anchor stores are exactly a session's worth of browsing.
Detailed motorway-by-motorway plans for Karachi's most-travelled EV routes, with stop-by-stop charging guidance.
The M-9 motorway is Karachi's easiest inter-city EV route. 165km is comfortably within single-charge range for any modern EV. ABB's DC charger at km 60 provides a mid-route option for those who want a buffer.
Charge to 100% here before joining M-9. Pakistan's fastest charger at 180kW means a full charge in under 30 minutes. No better pre-motorway top-up in the country.
Optional mid-route stop. Supports both CCS2 and GB/T. Most drivers departing Karachi with a full battery skip this and go direct to Hyderabad — but it's a useful buffer for older EVs or partial departures.
Arrive in Hyderabad. Limited public fast charging currently available — confirm station availability before arrival. The M-9 is one of Pakistan's most EV-capable motorway corridors.
A challenging long-distance EV route. Hyderabad (165km) is the only confirmed fast charge stop before Sukkur. Plan very carefully — the N-5 north of Hyderabad has limited verified charging infrastructure as of May 2026.
Charge to 100% before departing. This is critical — the next confirmed fast charger is 165km away.
Charge to 100% here. This is your last confirmed fast charger before Sukkur. Budget 30–45 minutes. Do not continue north below 80%.
Sukkur has limited verified public EV charging as of May 2026. Confirm availability before arrival. Consider staying overnight to charge at hotel if public infrastructure is unavailable.
Shell Recharge DHA Phase 5 is busiest weekday evenings 6–9pm and weekends 2–5pm. Visit before 11am or after 10pm for zero wait. M-9 motorway chargers are almost always immediately available.
Karachi is positioned for significant EV charging expansion through 2026–2027. Shell Pakistan has announced additional Recharge sites across DHA, Clifton, and North Karachi. The Sindh government's Green Transport Initiative targets 50+ public chargers across the city's major commercial corridors as part of the province's electric mobility roadmap. NTDC grid upgrades in DHA and PECHS are enabling higher-power DC installations up to 300kW. The M-9 motorway corridor is seeing rapid investment — PSO and ABB have committed to multiple new service area chargers along the Karachi–Hyderabad–Sukkur corridor by 2026, which will make the Lahore-to-Karachi EV route viable for the first time. Additionally, SECP's EV financing scheme has accelerated Karachi's EV adoption rate significantly — the city's registered EV count doubled in 2024 and is on track to double again by end of 2025, driving urgent demand for expanded public infrastructure.
Submit a charging station in 60 seconds. Verified in 48 hours · always free.